Minnesota, Colorado, Wisconsin, Michigan, North Dakota, South Dakota, Texas, New Mexico · State commissions for each operating company, including the Minnesota Public Utilities Commission (MPUC) and the Colorado Public Utilities Commission
Auditing Xcel Energy commercial bills
Eight states through Northern States Power Company (Minnesota and Wisconsin), Public Service Company of Colorado and Southwestern Public Service.
Xcel Energy bills commercial customers through four operating companies, each with its own tariff book, schedule codes and state regulator. A portfolio with stores in the Twin Cities and Denver deals with Northern States Power in Minnesota and Public Service Company of Colorado, under completely different schedule names. The schedules below are from Northern States Power Minnesota, where Xcel uses alphanumeric codes such as A10 for small general service and A14 for general service. Minnesota does not have retail choice, so Xcel bills supply and delivery together, with fuel and resource adjustments that change monthly. General service accounts with large demand are moved to a time-of-day schedule under tariff rules. Xcel also offers peak-controlled service options that discount demand in exchange for curtailment, and those options carry penalties when a site fails to curtail. For multi-site operators, schedule fit, demand values and accounts at closed sites drive most Xcel findings.
Practice notes
Start every Xcel audit by sorting accounts by operating company. Schedule codes like A14 apply only in NSP Minnesota, and Public Service Company of Colorado uses a separate set of commercial schedules under Colorado PUC rules. Matching each account to the correct tariff book is the first check, and the most common source of confusion for AP teams.
Review peak-controlled service enrollments before each control season. Sites that enrolled years ago may have changed operations and can no longer curtail, which turns the discount into penalty exposure. That is not a billing error, but penalties calculated on the wrong demand or on days without a control event are recoverable.
Check transfers to time-of-day service against the tariff's demand test. An account moved after a short period of high demand may not meet the 4 of 12 months requirement. We rebuild the history from 15-minute interval data and request a correction, with a rebill of the affected months, where the transfer was premature.
Commercial schedules we check
| Schedule | Applies to | What we check |
|---|---|---|
| A10Small General Service (NSP Minnesota) | Non-residential accounts with small loads that are not demand-billed. | Confirm small sites are not on a demand-billed schedule they do not need, and check customer charges on accounts with more than one meter. |
| A14General Service (NSP Minnesota) | Non-residential accounts that are not required to take time-of-day service, at secondary or primary voltage. | Rebuild billed demand from 15-minute interval data and confirm the voltage level billed matches the service. |
| A15General Time of Day Service (NSP Minnesota) | Non-residential accounts that elect time-of-day pricing, and A14 accounts transferred after measured demand reaches 1,000 kW or more in at least 4 of the past 12 months. | Check on-peak demand and energy periods against interval data, and confirm the transfer from A14 was triggered by the correct demand history. |
Schedule names and eligibility summarized from the utility's published tariff. The utility's current tariff book governs.
Xcel Energy questions
They are issued by different Xcel operating companies under separate tariffs and state rules.
Yes. We compare penalties with control event records and interval data and file where the calculation is wrong.
Yes. We audit gas accounts against the gas tariff for each operating company.
Audit your Xcel Energy accounts.
Connect bills for up to 50 meters. Get the findings report in about three weeks. Pay nothing unless money comes back.
- from bill access to first findings report
- 21 daysfrom bill access to first findings report
- of filed claims accepted by the utility in full or in part
- 94%of filed claims accepted by the utility in full or in part